Razel-Bec is resizing and concreting the Mfoundi Canal over a distance of 5 kilometres.

A MAJOR UNDERTAKING


The work will involve a trapezoid section with an opening of between 15 and 18 metres and a rectangular section to reduce the overall area taken up by the canal where there are problems of land occupancy.

The project also provides for the development of 30 hectares of landscaped open space along the canal and the construction of throughways on the banks.

canal-drainage-mfoundi-yaounde_2-1.jpg

750 000 m3

of excavated soil

725 000 m3

of backfill

45 000 m3

of concrete