9 STAFF INVOLVED
A two-layer technique was used: a first layer with 0/6 aggregates, then a second with 0/10 aggregates). The team featured 9 staff including machine operators, but also logistics staff (loading and supplying of aggregates and emulsions). They produced up to 44,000m² per day with 2 machines running continuously.