Razel-Bec Languedoc Roussillon is multiplying its wind farm projects.

THE VERSATILITY OF RAZEL-BEC


Each foundation slab requires between 350 and 800m3 of concrete and has to be cast in one go, which requires the development of a slow-setting formulation and calls for extraordinary precision in the casting. Thanks to its versatility in both civil engineering and earthworks, Razel-Bec can take on the entire turnkey contract (foundation slab, access and platform).

parc-eolien-de-bucy-les-pierreponts_1.jpg
922 000 tonnes/ year

A POSITIVE IMPACT ON THE ENVIRONMENT


To date, the Razel-Bec Languedoc-Roussillon agency has produced over 300 slabs for wind farms in various regions in France, representing 635 MW, thus reducing carbon emissions by 922,000 tonnes a year.