A PROJECT SUPERVISED BY THE PARIS PORT AUTHORITY
For the re-qualification of Port Victor, the industrial lessees of Paris Port Authority land were required to restructure their industrial facilities from A to Z. Supervised by the Paris Port Authority, the process included major architectural and landscaping work, particularly focusing on sharing space between the operator during the week on the one hand, and the public on the weekend and outside opening hours on the other, to promote water-level traffic on the docks. Depending on its characteristics, the mixture of "treated materials" - gravel and cement, lime, road binder, etc. - produced by the SAE plant in place is used by construction professionals to put down foundation layers in areas used by vehicles (roads, car parks, etc.) or to lay curbs or paving stones.
ERMONT
Rue Jean-Pierre Timbaud - BP 1
42420 LORETTE