You have arrived on the English website.

RAZEL-BEC baptizes its tunnel boring machine on line 14 South

The teams of the Line 14 South project - GC03 work section- led by Razel-Bec have reached an important milestone.
Tunnel boring Line 14 south
Tunnel boring Line 14 south
Grand Paris Express: RAZEL-BEC baptizes its tunnel boring machine on line 14 South
As part of the Grand Paris Express project, RAZEL-BEC, the representative of a consortium, won in March 2018 the contract to build a work section for the extension of Line 14 South, which will connect the Olympiades metro station to the Orly airport.

On April 3, 200 guests witnessed the christening of the Tunneler Line 14 South by Claire Merouze, the first female pilot fighter on Rafale. Baptized with the name of his godmother, the Tunneler Claire will come into action at the beginning of June 2019.

110,000 m³
Volume of concrete
520,000 m³
Volume of ground excavated
420
people working on the constrcution site

You may be interested in

  • In Africa, Razel-Bec works for people's access to water
  • Percement-tunnel-du-Frejus.jpg
    Breakthrough of the gallery in Fréjus Tunnel between France and Italy
  • A150.jpg
    A150 motorway inauguration