Our subsidiary PTC called upon for its expertise
The grouping in charge of the construction of the future terminal in Brest, dedicated to the handling of packages related to renewable forms of marine energy, has called upon the expertise of PTC to build a retaining dyke of 860 metres in length to both protect and increase the capacity of the terminal. Use of a 30HV vibro-driver equipped with variable momentum technology makes it possible to work in total safety close to the sensitive areas near the quay.