A project with specific constraints
The work consisted in reinforcing the existing runways and taxiways by milling and then laying an additional thickness of asphalt. At the same time, the teams laid 30,000m² of concrete slabs for the aircraft parking areas, built a new refuelling system and also intervened on the airport’s runway lighting system. Special mention must be made of the intervention of our Satelec subsidiary for all the electrical work.
Throughout all the work, there was no interruption in traffic at the airport thanks to the observance of an extremely tight phasing of the work and to a lot of night-time work.