You have arrived on the English website.

Delivery of the 4 * Canopy by Hilton Hotel, Paris 16th

After 30 months of heavy renovation work, the 123 rooms and suites of the building located a stone's throw from Place du Trocadéro have been successfully delivered.

Projet Eylau - Fayat Batiment

A MAJOR PROJECT DELIVERED WITH SUCCESS

The operation consisted of the "remodeling" of a building, which belonged to the city of Paris, transformed into a hotel complex comprising 123 rooms and suites as well as administrative offices.
This heavy restructuring operation was carried out using the top and down technique in order to guarantee rapid production rates. It also required plumbing, asbestos removal, acoustic separation of adjoining buildings, cleaning and partial demolition to allow resumption of work on three basement levels. Labeled BREEAM mention good, this real estate development operation was carried out under a off-plan contract.
Congratulations to the teams of FAYAT BÂTIMENT Île-de-France, SOMIFA (Real estate development subsidiary), SATELEC and SAGECES who have made this operation a great FAYAT synergy!

15 196 m2

floor area

30 month

rehabilitation works

4

underground parking levels