You have arrived on the English website.

Caisson

The contract, awarded to Joseph Paris, covers the design, manufacturing and commissioning of 2 caisson-type mobile closure devices
A project for the Toulon naval base
These steel caissons are designed to drain the large basins of the Toulon naval base. They are made from 10 impressively-large steel blocks, each weighing 49 tonnes. These blocks began to be assembled and painted in January 2018 in basin 3 of the Port of Saint-Nazaire before being transported by barge to Toulon in summer 2018.
Téléphone
Do you have a similar project?
Contact our subsidiary Joseph Paris, specialist in the design, construction and maintenance of special machines and metal works.