A75 motorway renovation

Two Breining Novalsealer 12000 units were used on the A75, south of Millau. The objective of the project was to repair the surface course of the motorway, on a moderately cracked road
A75 motorway renovation

9 staff involved

A two-layer technique was used: a first layer with 0/6 aggregates, then a second with 0/10 aggregates). The team featured 9 staff including machine operators, but also logistics staff (loading and supplying of aggregates and emulsions). They produced up to 44,000m² per day with 2 machines running continuously.

44 000 m²

per day

2

machines

9

staff involved