A Project for The Toulon Naval Base

  • Water
  • Water, Mobility, Transport

The contract, awarded to Joseph Paris, covers the design, manufacturing and commissioning of 2 caisson-type mobile closure devices. 

joseph-paris_bateau-porte-vue-en-nos-ateliers_content.jpg

A PROJECT FOR THE TOULON NAVAL BASE


These steel caissons are designed to drain the large basins of the Toulon naval base. They are made from 10 impressively-large steel blocks, each weighing 49 tonnes. These blocks began to be assembled and painted in January 2018 in basin 3 of the Port of Saint-Nazaire before being transported by barge to Toulon in summer 2018.