You have arrived on the English website.

Joseph Paris riding high in Brittany!

New contract for the design and construction of a swing bridge

In its role as head of consortium, Joseph Paris has been awarded the contract to design and build a new single-leaf swing bridge in Saint-Malo (35), replacing the existing structure dating from the 1950s.

The original bridge was hit by a number of irreparable issues and regularly closed for maintenance. The Brittany region voted to replace it completely and opted for a 44.5m-long, 12.8m-wide swing bridge (tonnage: 480t, ballast included). This solution increases the bridge’s clearance, making it easier for vessels to manoeuvre.

The Joseph Paris teams will also install a temporary mobile footbridge for the duration of the work (seven months). Delivery is scheduled for May 2021.

You may be interested in

  • Visite-du-chantier-de-l-imposante-grue-securisee-10-B-en-construction-par-Joseph-Paris-a-Toulon.jpg

    Une imposante grue sécurisée en construction par Joseph Paris à Toulon

  • Parking.jpg

    Fayat construit le plus grand parking en structure métallique d’Europe

  • RJH1.jpg

    Pose du pont polaire au RJH